2016-2024
Project Architect in charge of a large joint venture team.
Project Architect in charge of five packages of drawings relocating and expanding airline operation space.
Modernization and expansion of an existing warehouse building into a spec lab building.
Construction Project Management of an elevator modernization project at the Hatfield Federal Courthouse. This project was a joint venture with Studio Petretti.
Code Analysis for a change of occupancy and use from a commercial building to a school in a multifamily residential zone.
Design of renovations to renovate the existing buildings to school uses.
2011-2016
An amazing collaboration between DS+R and Bora Architects. The project is an inventive modern building placed into a historic campus.
Using materials that align with the historic fabric of its surroundings, the building is unapologetically modern.
A learning arm intertwines with a making arm, to envelope a vertical oculus throughout the space.
2007-2011
2000-2007
University of Oregon - Bachelor of Architecture - 2000
Universität Stuttgart - 1998-1999
Registered in Oregon #5339 -10/26/2007
LEED Green Associate
Portland Building Enclosure Council - Outgoing Chari and Current Secretary
Cleveland Youth Football - 7/8 Grade Football Coach
Cleveland High School Football Booster Club - Vice President
Mike Meade - Architect
Copyright © 2024 Mike Meade Architect - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.